Related links

ProfileNews (0)Events (0)Vacancies (0)Tenders (0)Documents (0)
COMPANY PROFILE
Bio-Projektas
Daukanto 19, 69430 Kazlų Rūda, Lithuania, Lithuania
Telephone:+370 343 98 948
Fax:
Email:info@bioprojektas.lt
Internet:http://www.bioprojektas.lt/
Member:


General description

From December 2000, UAB „Bioprojektas“ has been specializing in the designing of housing, public destination, economic activity structures and boiler-houses (up to 25 MW capacity). According to Certificate No. 2081, issued by the Ministry of Environment, we are involved in the designing of architectural, constructional, water supply and sewage, heating and ventilation, as well as electrical engineering (up to 1000 V voltage) parts. We perform technical maintenance of these parts of the project in the construction objects of special importance, prepare detailed planning documents of territories, and coordinate projects.

Attested heads and engineers of the project and project parts, working from 2003 according to the quality management system EN ISO 9001:2000, carry out the designing works.

We perform designing works throughout Lithuania, whereas projects are implemented with the application of most sophisticated computing, designing and drawing software programs.
BACK TO TOP

Resources

Total 0:
BACK TO TOP

International offices




BACK TO TOP

Services

PROJECT SUPPORT - Architecture. Civil Engineering. Industrial engineering. Structural engineering
CONSTRUCTION - Material testing. Site supervision
POST-CONSTRUCTION - Operations and maintenance
BACK TO TOP

Specialisations

The result of implementation of the company’s projects – designing works of boiler-houses up to 25 MW in various industrial enterprises, of which mention should be made of:

SP UAB „Utenos šilumos tinklai“;
AB „Kauno baldai“;
AB „Krekenavos agrofirma“;
SP UAB „Tauragės šilumos tinklai“;
AB „Simega“;
UAB „Dominga Hardwood“;
SP UAB „Molėtų šilumos tinklai“;
AB „Kauno liepsna“, etc

Designing works are carried out stage-by-stage:

1. Preprojecting proposals – proposals for a technological part, selection of equipment, handling of preprojecting documents, coordination of proposals with the customer;

2. Technical project – the essential requirements, decisions for construction of the designed building are determined, permit for construction is received according to it, the working design of the structure is prepared;

3. Working project covers the detailed decisions of the technical project. According to this project, construction works are carried out, building products and articles are manufactured, the structure is put into exploitation and is accepted for use, and legally registered.

Computing and designing programs: „Autocad“; „Windows“; „Staad pro“; „Start“; „Varsa“, and „Astera“ are used for calculation of the outlay value of all projects, consisting of thermal mechanical; architectural, constructions of the structure; automation-electrical engineering, environmental protection parts.
BACK TO TOP

Typical Projects

AB „Borisovdok“
Technical project for conversion of a 7 MW boiler-house to the operation with biofuel.

UAB „Interflex“
Technical project for conversion of a 4,5 MW boiler-house to the operation with biofuel.

Beržės RK, Tauragė
Technical work project for the reconstruction of a 7 MW RK.

AB „Matuizų pieninė“
Technical project for conversion of a 6,5 MW boiler-house to the operation with biofuel.

AB „Malsena“
Technical work project of a 1,5 MW gas boiler-house.

AB „Marijampolės grūdai“
Technical work project for the reconstruction of a 1,5 MW gas boiler-house.

Molėtai RK
Reconstruction of Molėtai RK – the technical work project of a wood waste fired 5 MW boiler.

AB AD „Žalsvytis“
Technical work project of a 1,2 MW gas boiler-house.

UAB „Bremunas textil“
Technical work project for the reconstruction of a 7.0 MW gas boiler-house.

AB „Simega“
Technical project for reconstruction of a 8.0 MW boiler-house to the operation with biofuel.

SP UAB „Rokiškio alna“
Technical project of the boiler-house with the capacity of 1.0 MW, fuelled with liquefied gas.

SPOO „Energy and Ecology“ in Chernyakhovsk
Technical work project of a boiler-house with the capacity of 5.5 MW, running on peat fuel.

UAB „Kretingos šilumos tinklai“
The technical work project of a wood waste fired 10 MW boiler.

Vydmantai
Technical project of a 0,96 MW boiler-house to the operation with biofuel.

AB „Krekenavos agrofirma“
Technical project of a 7 MW boiler-house.

Vilkaviškio RK
The technical project for conversion of a 12 MW boiler to the operation with biofuel.

AB „Kazlų Rūdos metalas“
The technical project for conversion of a 250 KW gas turbine.

UAB „Marijampolės pašarai“
The technical project for conversion of a 0,5 MW technological gas boiler-house

UAB „Techsis“
Technical project of the shop for production of solid biofuel (sawdust briquettes) in Ryškėnai village, Telšiai district.
BACK TO TOP
Printed from http://www.icondirect.net/ - you can access this page at
http://www.icondirect.net/published/302092.php
© 2005 RhysJones Publishing Limited, London