Related links

ProfileNews (0)Events (0)Vacancies (0)Tenders (0)Documents (0)
COMPANY PROFILE
ema Unihorn (india) pvt. ltd.
Vatika Atrium, B-Block,, 1st Floor, DLF Golf Course Road,, Sector 53,, Gurgaon, Haryana, India, 122002
Telephone:+91 0124 4093600
Fax:+91 0124 4093660
Email:info@emaunihorn.com
Internet:http://www.emaunihorn.com
Member:


General description

EMA Unihorn as an ISO 9001:2000 firm, certified by The British Standards Institution (BSI), UK, aims to achieve client's satisfaction by maintaining excellence in the services rendered. As per ISO 9001 procedures, a Quality Management System is implemented for every consultancy assignment. This envisages a Quality Assurance Plan right from the inception stage through completion and operation stages, encompassing all activities such as investigation, design, specifications, procurement, documentation, etc. Regular audits and checks are carried out at critical project milestones to ensure compliance of the highest order.
BACK TO TOP

Key personnel

  • Mr. Harbhajan Singh Bhatia, D.I.C. (London), B.Sc.(Engg.), Geo-technical and Pavement Specialist
  • Dr. Chandra Singh Surana, Ph.D. Civil Engineering,Bridg, Senior Structural cum Bridge Engineer.
  • Brig.  Amarjit Singh, B.Sc. Engg. (Civil), M.E.I.I.T, Director
  • Dr. T.V. Krishna Murthy, Ph.D. Transportation Engine, Managing Director
  • Mr. RICHARD H. SMALLENGANGE, M.Sc., Civil Engineering,, Chairman
BACK TO TOP

Resources

Total 0:
BACK TO TOP

International offices

Netherlands
Unihorn bvP.O. Box 58, 1633 ZH Avenhorn, The Netherlands, Netherlands
Tel: +31 229 547850
Fax: +31 229 547851
Email: info@unihorn.nl
Web: http://www : unihorn.nl

BACK TO TOP

Services

EMA Unihorn, formerly known as Engineers and Management Associates (EMA) has had a distinguished track record of over 22 years as a front ranking consultancy organization in Highways, Aviation and Tourism sectors. The group has successfully handled a large number of aviation and highway projects from concept to completion to include techno-economic feasibility study, detailed project report preparation and detailed engineering designs, tender documentation, pre-award evaluation, financial closure and construction supervision, quality assurance, project management and final commissioning. The group has a strength of over 240 engineers, planners, economists and other professionals from various disciplines.

Modern highways, world-class airports and State-of-the-Art infrastructural facilities interest the group and will remain as our goal for serving the Nation. The group has specialist section dealing the BOT, BOO and DBFO highway projects. The Airport Division is pursuing the projects for privatization of airports in India. All professional members of EMA-Unihorn are on oath to adhere to strict standards of quality assurance and quality control and not to compromise on quality programmes.
BACK TO TOP

Specialisations

INFRASTRUCTURE - Airports/air transport. Highways/road transport
COMMERCE AND INDUSTRY - Tourism
BACK TO TOP

Typical Projects

MAJOR PROJECTS COMPLETED DURING LAST 5 YEARS – HIGHWAYS/ROADS





1. DPR for 4-laning NH-2 Khaga – Varanasi: NHAI 1999-2000
length 202 Km(World Bank funded)

2. DPR for 4/6 -laning NH-4 Haveri –Belgaum – NHAI 2000-2002
Maharashtra Border: length 203 Km

3. DPR for 4-laning NH-1A Jalandhar – NHAI 2000-2001
Pathankot: length 21.8 km
4. Lender’s Engineer for ROB and approaches IDBI 2001-2002
(4-lane) on NH-22 at Dera Bassi, Punjab (BOT)

5. Construction Supervision for 4-laning NH-1A NHAI 2001-2004
Jalandhar –Pathankot: length 21.8 Km

6. Quality Control for Improvement/Widening PIDB 2003-2004
of 7 State Highways in Punjab : length 230 km.

7. DPR for 4-laning NH-25 Jhansi – JCN NHAI 2004-2005
of NH-2 : length 155 km.

8. DPR for 4-laning NH-75 Gwalior – Jhansi NHAI 2004
including Gwalior By-pass: length 122 km.

9. Quality Control of Major District and Other Roads M. P.(PWD) 2006
(Mandi fund): length 3300 km

10. Construction Supervision for Roads under MP Rural Road 2005
PMGSY Phse IV & V, length : 590 km Dev. Authority

11. Construction Supervision for State Road projects MP Road Dev. 2005
(BOT/ Govt. funded): length 176 km Corporation

12 Construction Supervision for State Road projects MP Road Dev. 2006
(BOT/ Govt. funded): length 59 km Corporation


And many more
BACK TO TOP
Printed from http://www.icondirect.net/ - you can access this page at
http://www.icondirect.net/published/303106.php
© 2005 RhysJones Publishing Limited, London